ELECTRICON carries out certified measurements – both in connection with the establishment of earthing systems and throughout the lifetime of the installation (see maintenance plan).
Our experience shows that systems can change over time, due to weather conditions – especially rain and cold – or due to faults in the installation, such as corrosion.
This may result in the system no longer meeting the required safety and functional standards, creating a false sense of security and potentially leading to personal hazards or operational disturbances in equipment.
As an essential part of the documentation for earthing systems, Electricon always prepares a drawing showing the location of individual electrodes, as well as the routing and depth of conductors, etc. With this documentation, it is possible to carry out future excavations or extensions without damaging the existing earthing system.